Frame ConstructionToday Kevin, Jessica and Allie Spent the afternoon and evening completing the frame construction. First, two semicircular divets were sanded into the wood in order to lower the recorder to the same level as the solenoids on the sheet metal. This allows for the solenoids to reach the recorder holes. The recorder was then secured to the frame using bent hose clamps. Finally, the solenoid, relay board and arduino then attached to the sheet metal using steel epoxy. Tomorrow the wires will all be reconnected and soldered. The final prototype will then be ready for final program testing and troubleshooting before Wednesday.